Checklist for Adoption of PAFMAC

The following checklist can be used to decide whether PAFMAC is the right solution for your building.

Checklist Categories Areas to Check For
Preliminary Questions โœ“ What kind of HVAC system are you currently using?
โœ“ 2-pipe fan coil?
โœ“ Are you considering replacement?
Interview/survey to determine baseline data and confirm technical drawings. โœ“ Type and specification of current fan coil system.
โœ“ Water inlet temperature (40๏ฝž120โ„‰)
โœ“ Electric breaker capacity
โœ“ Water quality survey
โœ“ Pipe life diagnosis
โœ“ Chilled / heat source system
โœ“ Drawing (Floor Plan, HVAC, Piping)
โœ“ Any additional information
Installation confirmation โœ“ Existing fan coil size (W x D x H).
โœ“ Piping position, piping route, piping size.
โœ“ Power supply, electric wire, switch wiring.
Judge the feasibility of PAFMAC installation. โœ“ Feasible
It is feasible to replace the existing FCU with PAFMAC. โœ“ Installation and operation of sample units
โœ“ Owner rating
โœ“ Purchase
โœ“ Construction / Installation
โœ“ Operation start

Our Products

PAFMAC Floor Unit

FFP17AA K
Cooling Capacity 9,300 Btu/h

FFP27AA K
Cooling Capacity 13,700 Btu/h

PAFMAC Ceiling Unit

FBP13AA
Cooling Capacity 6,800 Btu/h

FBP37BA K
Cooling Capacity 13,700 Btu/h

Vertical Stack Unit

FTP37AA K
Cooling Capacity 11,000 Btu/h

FTP37AA K
Cooling Capacity 18,500 Btu/h