Checklist for Adoption of PAFMAC
The following checklist can be used to decide whether PAFMAC is the right solution for your building.
Checklist Categories | Areas to Check For |
---|---|
Preliminary Questions | ✓ What kind of HVAC system are you currently using? ✓ 2-pipe fan coil? ✓ Are you considering replacement? |
Interview/survey to determine baseline data and confirm technical drawings. | ✓ Type and specification of current fan coil system. ✓ Water inlet temperature (40~120℉) ✓ Electric breaker capacity ✓ Water quality survey ✓ Pipe life diagnosis ✓ Chilled / heat source system ✓ Drawing (Floor Plan, HVAC, Piping) ✓ Any additional information |
Installation confirmation | ✓ Existing fan coil size (W x D x H). ✓ Piping position, piping route, piping size. ✓ Power supply, electric wire, switch wiring. |
Judge the feasibility of PAFMAC installation. | ✓ Feasible |
It is feasible to replace the existing FCU with PAFMAC. | ✓ Installation and operation of sample units ✓ Owner rating ✓ Purchase ✓ Construction / Installation ✓ Operation start |